Projects
Recent Projects
Jawa Technologies
Optical Fibre Specialists
M6 17 Km of optical fibre installation Canterbury Ausgrid substation to M6 Rockdale communication room...
Installing Optical Fibre Backbone for runway sensors at Western Sydney Airport 5 Km...
Installing “Air Blown Fibre “(ABF) from Box Hill Ausgrid substation to Vineyard Transgrid substation 7.2KM...
Hauling and splicing optical fibre, installing the underground enclosures, terminating / splicing ....
Hauling optical fibre 288f into 100mm conduit 14.5 Km. Splicing the fibre cable in Communication pits ....
Hauling 12.6km of optical fibre. Splicing the fibre cable in Communication pits and supplying and installing ....
Hauling optical fibre 72f into 63mm conduit 1.2 Km. Splicing the fibre cable in Communication pits and supplying ...
From 2010 to 2017 several of AusGrid’s contractors hired Jawa Technologies to provide expert...
At the site planned for the new Western Sydney Airport, a small section of TransGrid’s 330kV high voltage...
From 2013 to 2016, Jawa Tech has been contracted to support Endeavour Energy’s Sydney-based ...
Part of the road widening involves upgrading and relocating multiple utilities including gas, water, power...
As part of building an underground tolled motorway linking the M1 Pacific Motorway...