January 2023 Bringelly to “Western Sydney Airport” (WSA)

Hauling optical fibre;  Splicing the fibre cable in Communication pits. Supplying and installing the underground enclosures. Terminating / splicing the optical fibre into fibre trays at the fibre cabinets and testing the fibre links.

Project Specifications

Client:

Garde

Project Details:
  • Hauling optical fibre 72f into 63mmconduit 1.2 Km
  • Splicing the fibre cable in Communication pits Supplying and installing the underground enclosures.
  • Terminating / splicing the optical fibre into fibre trays at the fibre cabinets at the communication rooms
  • Testing the fibre links with an “Optical Time Domain Reflectometer” (OTDR) providing results to the client