February 2023 March 2023 Box Hill Ausgrid substation to Vineyard Transgrid substation

Hauling and splicing optical fibre and installing the underground enclosures.

Project Specifications

Client:

Ferrycarrig Civil Contractor

Project Details:
  • Hauling optical fibre 144f into 100mm conduit 7.2 Km
  • Splicing the fibre cable in Communication pits Supplying and installing the underground enclosures
  • Terminating / splicing the optical fibre into fibre trays at the fibre cabinets at the communication rooms
  • Testing the fibre links with an “Optical Time Domain Reflectometer” (OTDR) providing results to the client