October 2022 Surry Hills to Metro substation (Central Station) 1.2 KM

This project involved hauling, splicing and testing 1.2 km of optical fibre for the client Quickway.

Project Specifications

Client:

Quickway

Project Details:
  • Hauling optical fibre 72f into 63mmconduit 1.2 Km
  • Splicing the fibre cable in Communication pits Supplying and installing the underground enclosures.
  • Terminating / splicing the optical fibre into fibre trays at the fibre cabinets at the communication rooms
  • Testing the fibre links with an “Optical Time Domain Reflectometer” (OTDR) providing results to the client